About
Overland Park, KS (Kansas City) global EPC, employee-owned (est. 1915). Electrical engineering project scope explicitly includes power system coordination and arc flash hazard analysis plus short circuit and protective relay settings (ETAP/SKM).
Service area
- Headquarters / primary office
- Overland Park, KS
- Publicly supported service area
- Nationwide service claimed
- Other public office locations
- Overland Park KS (world HQ) + offices nationwide (MN, MI, CO, TX, AZ, FL, NC, OR, etc.)
Office locations and service areas are tracked separately. Confirm project-location availability directly with the provider.
Services listed
Arc Flash StudyPower System StudiesProtective Device Coordination StudyShort Circuit Study
Verified attributes
- Short-circuit study
- Protective-device coordination
- PE-reviewed/sealed reports
Only attributes explicitly supported by reviewed public sources are shown. Unlisted capabilities may still be available.
Industries publicly listed
Data centers, Federal, Industrial manufacturing/O&G, Power generation, Water/wastewater